A little play. A lot of love.No shipping charge
1 / 5

About this item

Snagle Paw Dog Tie Out Cable Is The Ultimate Solution For Pet Owners Who Love Spending Time Outdoors With Their Furry Friends. With A Remarkable Break Strength Of 1000Lbs, This Robust Tie Out Cable Ensures That Your Dog Can Enjoy Freedom While Remaining Safe And Secure. Designed With A Secure Swivel Hook Latch, Our Cable Prevents Tangling And Offers Peace Of Mind During Outdoor Activities Like Camping, Hiking, Or Just Lounging In The Backyard.

Crafted From A Soft Yet Durable Wire Rope, It Wont Irritate Your Pets Coat, Allowing Them To Roam Comfortably. Incorporating Innovative Spring Buffer Technology, The Snagle Paw Dog Tie Out Cable Reduces Shock And Strain, Enhancing The Safety Of Both Your Pet And The Cable Itself.

When Its Time To Pack Up, Our Convenient Storage Option Makes It Easy To Stow Away Without Hassle. Plus, Cleaning Is A Breeze - Just A Quick Wipe Will Keep It In Top Condition. Whether You Have A Small Or Large Dog, This Versatile Dog Tie Out Cable Is Perfect For Any Outdoor Adventure.

Pair It With Our Premium Dog Leads For A Complete Outdoor Experience That Prioritizes Safety And Comfort. Enjoy Every Moment Outside With Your Beloved Pet Using The Snagle Paw Dog Tie Out Cable!

Snagle Paw Heavy Duty Long Leads For Yard 200Ft-1000Lbs Break Strength

4.6552 ratings
Free shippingGenuine and newTracked
$77.99
Free shipping
● In stock

Quantity

1
Arrives Nov 5 – Nov 6
to United States · Order within …
Free shipping
  • Sold by Hey Lovi
    Ships from the United States, tracked all the way to your door.
  • Genuine and new, or a full refund
    Bought new in the USA from the brand or an established US retailer. Not what you ordered? Tell us within 7 days of delivery.
  • Damaged or wrong? Full refund or replacement
    Send us photos within 7 days of delivery. Returns policy
  • Secure card checkout
    Visa and Mastercard, credit or debit. Card details go to Razorpay, a certified payment provider, never to us.

Buy it together

Goes well with this item. Each is the same price as on its own page.

Total for 3 items
$126.97

Common questions

AUTHENTICITYIs this product genuine?
Yes. Every product is bought new in the USA from the brand or an established US retailer, and if one is ever found not to be genuine, we refund you in full.
DELIVERYHow long does delivery take?
3 to 4 days door to door for this item, including the time we take to place your order with the brand or retailer. Every parcel travels with a carrier tracking number.
PRICINGWhat does the price include?
Nothing is added at checkout: there is no shipping charge.
RETURNSWhat if it arrives damaged or defective?
We will make it right. Email photographs, or a short video of the fault, to hello@heylovi.com within 7 days of delivery and we refund the full amount or send a replacement at no cost. For the hygiene and safety of every pet, used items and change-of-mind returns cannot be accepted, so if you are unsure about size or materials, ask us before ordering.
FITIs it right for my pet?
Check the size, materials and care on this page against your pet's size and play style, introduce anything new gently, and stay close during play. Not sure? Write to hello@heylovi.com before you order and we will help.

Specifications

Brand
Snagle Paw
Type
Training & Behavior
Ships from
United States
Shipping weight
3.03 kg
Package size
24.1 × 18.8 × 8.6 cm
Category
Dog › Training & Behavior

More from Training & Behavior.

Kdszjdv Corrector Spray Dog Trainer 6 Pack 80Ml Dog Corrector
KdszjdvTraining & Behavior
★ 3.4(5 ratings)
$63.99
Free US shipping
Training & Behavior
Topknot 2 Pack Dog Tie Out Cable, 15 Ft Dog Lead For Yard
TopknotTraining & Behavior
★ 3.7(6 ratings)
$31.99
Free US shipping
Training & Behavior
Spring Dog Collar, Caninedesign, Valentine, St Patricks Day
CANINEDESIGN QUALITYTraining & Behavior
★ 3.5(6 ratings)
$18.99
Free US shipping
Training & Behavior
Lifeswel 15 Inch Dog Tie Out Stake
LifeswellTraining & Behavior
★ 3.8(6 ratings)
$27.99
Free US shipping
Training & Behavior