A little play. A lot of love.No shipping charge
1 / 7

About this item

dog chain leash 20ft with dog tie out stake long dog leash 20 feet and dog yard stake reflective dog leads for yard dog spiral stake for camping and beach dog runs for outside dog yard leash and stake

Heavy Duty Tie Out Stake: Our dog tie out cable and stake set is designed with more solid and durable thickened stainless steel spiral stake and reinforced O-ring make this dog anchor no more easier broken and bending Ergonomic handle of the dog ground stake gives more comfort while saving time and effort when insert and pull out 20FT chain Dog Leash: Our 20 feet dog tie out leads for yard with 50mm diameter stainless steel vinyl-coated rope which is strength tested for dogs up to 125lbs All the run cables have rigorously quality tested to withstand up to 5000+N pull force Providing more space for free movement while ensuring safety High Quality Buckle: Heavy duty 360A swivel clip is designed with high grade steel which is rust-proof and wear-resistant ultra-light but super strong for small to large dogs Both ends of the dog chain leads have no tangle clips which can reduce the tangle when dog is moving aim to prevent dogs from being entangled Easy to Use: With the ergonomic handle and spiral stake design you can screw the dog yard stake into the ground very easy and then connect with the tie out cable the quick release clips can ensure easy on & off connection saving time and effort A complete Set & Easy to carry: Package include: 1 X 20 ft dog runner line 1 X dog tie out stake 1 X oxford storage bag for easy carrying out when camping outside Our dog stake and tie out cable set is heavy duty enough for small to large dogs up to 125lbs dogs

Snagle Paw Dog Tie Out Stake And Run Cable, 20Ft Long Lead With Yard Stake, Ice Blue

4.626 ratings
Free shippingGenuine and newTracked
$25.99
Free shipping
● In stock

Quantity

1
Arrives Nov 5 – Nov 6
to United States · Order within …
Free shipping
  • Sold by Hey Lovi
    Ships from the United States, tracked all the way to your door.
  • Genuine and new, or a full refund
    Bought new in the USA from the brand or an established US retailer. Not what you ordered? Tell us within 7 days of delivery.
  • Damaged or wrong? Full refund or replacement
    Send us photos within 7 days of delivery. Returns policy
  • Secure card checkout
    Visa and Mastercard, credit or debit. Card details go to Razorpay, a certified payment provider, never to us.

Buy it together

Goes well with this item. Each is the same price as on its own page.

Total for 3 items
$74.97

Common questions

AUTHENTICITYIs this product genuine?
Yes. Every product is bought new in the USA from the brand or an established US retailer, and if one is ever found not to be genuine, we refund you in full.
DELIVERYHow long does delivery take?
3 to 4 days door to door for this item, including the time we take to place your order with the brand or retailer. Every parcel travels with a carrier tracking number.
PRICINGWhat does the price include?
Nothing is added at checkout: there is no shipping charge.
RETURNSWhat if it arrives damaged or defective?
We will make it right. Email photographs, or a short video of the fault, to hello@heylovi.com within 7 days of delivery and we refund the full amount or send a replacement at no cost. For the hygiene and safety of every pet, used items and change-of-mind returns cannot be accepted, so if you are unsure about size or materials, ask us before ordering.
FITIs it right for my pet?
Check the size, materials and care on this page against your pet's size and play style, introduce anything new gently, and stay close during play. Not sure? Write to hello@heylovi.com before you order and we will help.

Specifications

Brand
Snagle Paw
Manufacturer
SnagleDirect
Type
Training & Behavior
Ships from
United States
Shipping weight
839 g
Package size
42.8 × 16.1 × 5.2 cm
Category
Dog › Training & Behavior

More from Training & Behavior.

Kdszjdv Corrector Spray Dog Trainer 6 Pack 80Ml Dog Corrector
KdszjdvTraining & Behavior
★ 3.4(5 ratings)
$63.99
Free US shipping
Training & Behavior
Topknot 2 Pack Dog Tie Out Cable, 15 Ft Dog Lead For Yard
TopknotTraining & Behavior
★ 3.7(6 ratings)
$31.99
Free US shipping
Training & Behavior
Spring Dog Collar, Caninedesign, Valentine, St Patricks Day
CANINEDESIGN QUALITYTraining & Behavior
★ 3.5(6 ratings)
$18.99
Free US shipping
Training & Behavior
Lifeswel 15 Inch Dog Tie Out Stake
LifeswellTraining & Behavior
★ 3.8(6 ratings)
$27.99
Free US shipping
Training & Behavior