A little play. A lot of love.No shipping charge
1 / 7

About this item

  • Lynxking check cord dog lead is great for walking, exercising and training dogs.
  • It is made with Non-absorbent lightweight but strong material, has a comfortable double braided handle for your control.
  • Check cord long dog leash has 3/8' thickness and 10ft 15ft 30ft 50ft length, available in black blue orange red and black 5 colors.

In order to make it easy for you to carry, we presented you an orange drawstring backpack bag, you can put check cord in the bag before and after use. The round climbing rope and 360 degree rotating clasp design long training leash will not sink and will not tangle in your backpack, It is perfect for training and exercises with your dog.

Specification

Size: 3/8' * 50ft Color: orange

Lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy

4.61K+ ratings100 bought last month
Free shippingGenuine and newTracked
$23.99
Free shipping
● In stock

Quantity

1
Arrives Nov 5 – Nov 6
to United States · Order within …
Free shipping
  • Sold by Hey Lovi
    Ships from the United States, tracked all the way to your door.
  • Genuine and new, or a full refund
    Bought new in the USA from the brand or an established US retailer. Not what you ordered? Tell us within 7 days of delivery.
  • Damaged or wrong? Full refund or replacement
    Send us photos within 7 days of delivery. Returns policy
  • Secure card checkout
    Visa and Mastercard, credit or debit. Card details go to Razorpay, a certified payment provider, never to us.

Buy it together

Goes well with this item. Each is the same price as on its own page.

Total for 3 items
$52.97

Common questions

AUTHENTICITYIs this product genuine?
Yes. Every product is bought new in the USA from the brand or an established US retailer, and if one is ever found not to be genuine, we refund you in full.
DELIVERYHow long does delivery take?
3 to 4 days door to door for this item, including the time we take to place your order with the brand or retailer. Every parcel travels with a carrier tracking number.
PRICINGWhat does the price include?
Nothing is added at checkout: there is no shipping charge.
RETURNSWhat if it arrives damaged or defective?
We will make it right. Email photographs, or a short video of the fault, to hello@heylovi.com within 7 days of delivery and we refund the full amount or send a replacement at no cost. For the hygiene and safety of every pet, used items and change-of-mind returns cannot be accepted, so if you are unsure about size or materials, ask us before ordering.
FITIs it right for my pet?
Check the size, materials and care on this page against your pet's size and play style, introduce anything new gently, and stay close during play. Not sure? Write to hello@heylovi.com before you order and we will help.

Specifications

Brand
Lynxking
Manufacturer
Keenleader.,ltd.
Type
Training & Behavior
Ships from
United States
Shipping weight
460 g
Package size
25 × 14.2 × 5.2 cm
Category
Dog › Training & Behavior
Barcode
698775283515

More from Training & Behavior.

Kdszjdv Corrector Spray Dog Trainer 6 Pack 80Ml Dog Corrector
KdszjdvTraining & Behavior
★ 3.4(5 ratings)
$63.99
Free US shipping
Training & Behavior
Topknot 2 Pack Dog Tie Out Cable, 15 Ft Dog Lead For Yard
TopknotTraining & Behavior
★ 3.7(6 ratings)
$31.99
Free US shipping
Training & Behavior
Spring Dog Collar, Caninedesign, Valentine, St Patricks Day
CANINEDESIGN QUALITYTraining & Behavior
★ 3.5(6 ratings)
$18.99
Free US shipping
Training & Behavior
Lifeswel 15 Inch Dog Tie Out Stake
LifeswellTraining & Behavior
★ 3.8(6 ratings)
$27.99
Free US shipping
Training & Behavior