A little play. A lot of love.No shipping charge
1 / 5

About this item

Luffwell Dog Trolley System Dogs Are Always Full Of Energy, Especially In Yard, Parks, Beaches, Forests, Camping, Adventures, And Outdoor Activities. But When We Are Outdoors And We Have To Leave Our Dogs For Some Minutes, And We Want Them To Stay In The Location To Wait Us Back.

Or When We Fish By The Lake, Cook In The Forest, Build Tents In The Wild, Or Sun Bathe On The Beach, They May Not Be Sitting With Us, When We Don't Pay Attention, They May Get Lost In The Wild. So You Just Need A Long And Strong Dog Lead Spike Cable To Keep Your Dog's Range Of Activities Or The Safety Of People Around.

A Trusty Anchor To Keep Pets Safe And Secure With Luffwell Dog Trolley System! Product Detail1. 50Ft/100Ft/120Ft/150Ft/200Ft Dog Aerial Dog Runner Tie Out Cable And 10Ft/15Ft Dog Runner Line, Let Dog Run Outside 2. 360-Degree Swivel Aviation Aluminum Carbine Clips Allows For Wider Roaming Without Tangling3.

50Ft/100Ft/120Ft/150Ft/200Ft Galvanized Steel Leash Is Coated With Crack-Resistant Poly Vinyl To Stay Strong Against Pulling, Weatherproof Chrome-Plated Coating To Prevent Rust, And Easy To Clean.4.Comes With A Thoughtful Sturdy Oxford Carry Bag For Easy Storage.

Specifications: Material: Chrome Plating Carbon Steel Wirecolor: Red Dog Leash Length: 50Ft/100Ft/120Ft/150Ft/200Ft; Dog Leads Cable Length: 10Ft/15Ft; Fit Dog Sizes: Up To 250Lbspackage Included: 1 X Aerial Tie Out Cable With Pulley1 X Runner Line With Tighten Hook2 X Stopper2 X Screw Hook2 X U-Shape Clamp1 X Oxford Carry Bag

Luffwell Runner For Yard, 15Ft

4.41K+ ratings
Free shippingGenuine and newTracked
$70.99
Free shipping
● In stock

Quantity

1
Arrives Nov 5 – Nov 6
to United States · Order within …
Free shipping
  • Sold by Hey Lovi
    Ships from the United States, tracked all the way to your door.
  • Genuine and new, or a full refund
    Bought new in the USA from the brand or an established US retailer. Not what you ordered? Tell us within 7 days of delivery.
  • Damaged or wrong? Full refund or replacement
    Send us photos within 7 days of delivery. Returns policy
  • Secure card checkout
    Visa and Mastercard, credit or debit. Card details go to Razorpay, a certified payment provider, never to us.

Buy it together

Goes well with this item. Each is the same price as on its own page.

Total for 3 items
$122.97

Common questions

AUTHENTICITYIs this product genuine?
Yes. Every product is bought new in the USA from the brand or an established US retailer, and if one is ever found not to be genuine, we refund you in full.
DELIVERYHow long does delivery take?
3 to 4 days door to door for this item, including the time we take to place your order with the brand or retailer. Every parcel travels with a carrier tracking number.
PRICINGWhat does the price include?
Nothing is added at checkout: there is no shipping charge.
RETURNSWhat if it arrives damaged or defective?
We will make it right. Email photographs, or a short video of the fault, to hello@heylovi.com within 7 days of delivery and we refund the full amount or send a replacement at no cost. For the hygiene and safety of every pet, used items and change-of-mind returns cannot be accepted, so if you are unsure about size or materials, ask us before ordering.
FITIs it right for my pet?
Check the size, materials and care on this page against your pet's size and play style, introduce anything new gently, and stay close during play. Not sure? Write to hello@heylovi.com before you order and we will help.

Specifications

Brand
Luffwell
Type
Training & Behavior
Ships from
United States
Shipping weight
3.33 kg
Package size
27.3 × 24 × 8.4 cm
Category
Dog › Training & Behavior

More from Training & Behavior.

Kdszjdv Corrector Spray Dog Trainer 6 Pack 80Ml Dog Corrector
KdszjdvTraining & Behavior
★ 3.4(5 ratings)
$63.99
Free US shipping
Training & Behavior
Topknot 2 Pack Dog Tie Out Cable, 15 Ft Dog Lead For Yard
TopknotTraining & Behavior
★ 3.7(6 ratings)
$31.99
Free US shipping
Training & Behavior
Spring Dog Collar, Caninedesign, Valentine, St Patricks Day
CANINEDESIGN QUALITYTraining & Behavior
★ 3.5(6 ratings)
$18.99
Free US shipping
Training & Behavior
Lifeswel 15 Inch Dog Tie Out Stake
LifeswellTraining & Behavior
★ 3.8(6 ratings)
$27.99
Free US shipping
Training & Behavior