A little play. A lot of love.No shipping charge
1 / 5

About this item

SuplutuX dog training leash gives your pet maximum freedom and safety under your control. Whether its a large dog or a puppy, trainers still want them to run more freely under control. So SuplutuX dog training leash gives a chance for puppies to enjoy more free roam, in other words, being an OFF-LEASH experience.

The long lead also provides a clear method of communication to help pets make memories formed. Great for training, walking, camping, hiking, hunting, backyard, beach, swimming, outdoor play balls, or frisbee.

  • Length adjustment buckle: The metal buckle allows adjusting the leash length between 30 - 15ft to fit the various sites.
  • Soft padded handle: It provides more comfortable to hold during long training and walking, which allows better control.
  • 360 metal clasp: After easy attachment to the collar, the swivel clasp prevents your pet from entangled in the rope.
  • Portable pouch: This portable bag can store a 30 ft dog training leash or other small stuff like a poop bag.
  • It is a great long leash for dog training for any size dog to follow your instructions to stop or recall.
  • This 30ft long dog leash is made of lightweight yet durable nylon by reinforced stitching.
  • SuplutuX long leash for dog training is tested to over 200 lbs pull force. Its very safe for training small, medium, and large dogs.
  • Note: Pet leashes should be periodically checked to ensure they are maintained in proper condition.
  • Package: 1 x 30 ft dog leash, 1 x pouch

Long Lead Leash for Dog Outside Training 30ft Adjustable Obedience Recall Dog Training

4.3368 ratings
Free shippingGenuine and newTracked
$17.99
Free shipping
● In stock

Quantity

1
Arrives Nov 5 – Nov 6
to United States · Order within …
Free shipping
  • Sold by Hey Lovi
    Ships from the United States, tracked all the way to your door.
  • Genuine and new, or a full refund
    Bought new in the USA from the brand or an established US retailer. Not what you ordered? Tell us within 7 days of delivery.
  • Damaged or wrong? Full refund or replacement
    Send us photos within 7 days of delivery. Returns policy
  • Secure card checkout
    Visa and Mastercard, credit or debit. Card details go to Razorpay, a certified payment provider, never to us.

Common questions

AUTHENTICITYIs this product genuine?
Yes. Every product is bought new in the USA from the brand or an established US retailer, and if one is ever found not to be genuine, we refund you in full.
DELIVERYHow long does delivery take?
3 to 4 days door to door for this item, including the time we take to place your order with the brand or retailer. Every parcel travels with a carrier tracking number.
PRICINGWhat does the price include?
Nothing is added at checkout: there is no shipping charge.
RETURNSWhat if it arrives damaged or defective?
We will make it right. Email photographs, or a short video of the fault, to hello@heylovi.com within 7 days of delivery and we refund the full amount or send a replacement at no cost. For the hygiene and safety of every pet, used items and change-of-mind returns cannot be accepted, so if you are unsure about size or materials, ask us before ordering.
FITIs it right for my pet?
Check the size, materials and care on this page against your pet's size and play style, introduce anything new gently, and stay close during play. Not sure? Write to hello@heylovi.com before you order and we will help.

Specifications

Brand
SuplutuX
Type
Training & Behavior
Ships from
United States
Shipping weight
222 g
Package size
19.3 × 18.4 × 4.4 cm
Category
Dog › Training & Behavior

More from Training & Behavior.

Kdszjdv Corrector Spray Dog Trainer 6 Pack 80Ml Dog Corrector
KdszjdvTraining & Behavior
★ 3.4(5 ratings)
$63.99
Free US shipping
Training & Behavior
Topknot 2 Pack Dog Tie Out Cable, 15 Ft Dog Lead For Yard
TopknotTraining & Behavior
★ 3.7(6 ratings)
$31.99
Free US shipping
Training & Behavior
Spring Dog Collar, Caninedesign, Valentine, St Patricks Day
CANINEDESIGN QUALITYTraining & Behavior
★ 3.5(6 ratings)
$18.99
Free US shipping
Training & Behavior
Lifeswel 15 Inch Dog Tie Out Stake
LifeswellTraining & Behavior
★ 3.8(6 ratings)
$27.99
Free US shipping
Training & Behavior