The Long Trainer 1 inch nylon dog leash from Leash Boss is meticulously crafted for large dogs, ensuring both strength and reliability. Unlike cotton leashes, which can easily break, this nylon leash is designed to withstand the strength of your big dog. Made from high-quality nylon, this leash promises durability for daily use over extended periods. Experience the Leashboss Difference with a leash built to last.
Long leashes can become tangled during storage or transport, creating a frustrating mess. Our innovative Hook and Loop Coiling System simplifies this process. Just coil your leash and secure it with the strap, using the hook and loop closure for easy transport. Enjoy hassle-free handling with this unique feature.
- 15 Feet: Ideal for recall training and walking.
- 20 Feet: Perfect for exploratory walks and potty breaks within a shorter range.
- 30 Feet: Great for close ball play and allowing your dog freedom during potty time.
- 50 Feet: Ultimate freedom for playing with tennis balls or flying discs, simulating off-leash conditions.
- Please remember that all long leashes should be paired with a dog harness, not a collar. This leash is not a retractable leash.
- Assembled in the USA
- This leash is proudly designed and assembled in California at Leashboss HQ. Each detail is crafted with care, ensuring a product that meets the highest standards of quality.
- 5 year manufacturer's warranty
Your purchase is protected by The Boss Promise, a 5-year manufacturer's warranty covering defects, product issues, and chewed leashes. Feel secure in your investment with this exceptional warranty.
- Ultra durable training lead: Made from strong, durable nylon that is softer and stronger than cotton, perfect for training, outdoor activities, and beach outings.
- Comfort and ease: Features reinforced stitching and a nickel-plated clip that resists twisting or tangling, ensuring a smooth experience while reeling in your dog.
- Choose your handle: Available with options including a sturdy foam handle for comfort, a rubber molded handle for strong grip, or a lightweight nylon handle for travel.
- Versatile use: A great training leash for large and medium dogs, ideal for hiking, camping, recall training, and outdoor fun.
- Great for any breed: Suitable for puppies and large dogs alike, with lengths ranging from 15 to 100 ft, easily clip onto Leashboss collars or harnesses.
BUY NOW and discover why our customers keep returning to Leashboss for their dog leash needs!