A little play. A lot of love.No shipping charge
1 / 5

About this item

About Amagood Paying For Nothing But Value. We Have A Variety Of Advanced Production Equipment To Produce The Long Leashes, As Well As Supply The Special Customized Services To Different Franchiser And Customers. If You Are A Dealer Or Retail Store, We Can Customize Different Specifications Of Long Leashes For You.

Amagood Dog Training Leash For Dog This Dog Traning Rope Is Provided With The Lightweight Nylon Materials And The High Quality Rotating Hooks Toreduce The Burden On Pets And Owners And Extend The Serice Lift Of The Belt. It Is Designed For Training, Tie Out, Play, Safety, Camping, Teaching, Swiming And Hiking.

This Dog Leash Measures 3/4 Inch Wide By 15Ft 20Ft 30Ft 50Ft Leagth. You Will Like It. Recommended Use 1. 15 And 20 Ft Long Dog Leash: Great For Exploratory Walking, Potty With Shorter Range.

2. 30 Ft Long Dog Leash: Close Ball Play, Using The Potty With Freedom. 3. 50 Ft Long Dog Leash: Recall Traning, Freedom To Romp, Off_Leash Simulation Long Leash Width: 3/4 Inch Wide Package Content 1Xlong Leash

Amagood Dog Training Leash Long Recall Training Agility Leash-15 Ft 20 Ft 30 Ft 50 Ft Long

3.54 ratings
Free shippingGenuine and newTracked
$11.99
Free shipping
● In stock

Quantity

1
Arrives Nov 5 – Nov 6
to United States · Order within …
Free shipping
  • Sold by Hey Lovi
    Ships from the United States, tracked all the way to your door.
  • Genuine and new, or a full refund
    Bought new in the USA from the brand or an established US retailer. Not what you ordered? Tell us within 7 days of delivery.
  • Damaged or wrong? Full refund or replacement
    Send us photos within 7 days of delivery. Returns policy
  • Secure card checkout
    Visa and Mastercard, credit or debit. Card details go to Razorpay, a certified payment provider, never to us.

Buy it together

Goes well with this item. Each is the same price as on its own page.

Total for 3 items
$39.97

Common questions

AUTHENTICITYIs this product genuine?
Yes. Every product is bought new in the USA from the brand or an established US retailer, and if one is ever found not to be genuine, we refund you in full.
DELIVERYHow long does delivery take?
3 to 4 days door to door for this item, including the time we take to place your order with the brand or retailer. Every parcel travels with a carrier tracking number.
PRICINGWhat does the price include?
Nothing is added at checkout: there is no shipping charge.
RETURNSWhat if it arrives damaged or defective?
We will make it right. Email photographs, or a short video of the fault, to hello@heylovi.com within 7 days of delivery and we refund the full amount or send a replacement at no cost. For the hygiene and safety of every pet, used items and change-of-mind returns cannot be accepted, so if you are unsure about size or materials, ask us before ordering.
FITIs it right for my pet?
Check the size, materials and care on this page against your pet's size and play style, introduce anything new gently, and stay close during play. Not sure? Write to hello@heylovi.com before you order and we will help.

Specifications

Brand
Amagood
Manufacturer
DaSheng
Type
Training & Behavior
Ships from
United States
Shipping weight
103 g
Package size
13.4 × 10 × 3.4 cm
Category
Dog › Training & Behavior
Barcode
745860376703

More from Training & Behavior.

Kdszjdv Corrector Spray Dog Trainer 6 Pack 80Ml Dog Corrector
KdszjdvTraining & Behavior
★ 3.4(5 ratings)
$63.99
Free US shipping
Training & Behavior
Topknot 2 Pack Dog Tie Out Cable, 15 Ft Dog Lead For Yard
TopknotTraining & Behavior
★ 3.7(6 ratings)
$31.99
Free US shipping
Training & Behavior
Spring Dog Collar, Caninedesign, Valentine, St Patricks Day
CANINEDESIGN QUALITYTraining & Behavior
★ 3.5(6 ratings)
$18.99
Free US shipping
Training & Behavior
Lifeswel 15 Inch Dog Tie Out Stake
LifeswellTraining & Behavior
★ 3.8(6 ratings)
$27.99
Free US shipping
Training & Behavior